Compare dedicated access and full-fibre broadband on service guarantees. This guide is for UK business owners, IT managers and facilities teams comparing options for London and South East premises. It explains how to frame a useful specification and avoid misleading like-for-like comparisons.
Request written service levels, contention details and realistic lead times. Survey, construction, contract length, installation and backup circuits affect lifetime cost.
What should you compare?
Compare dedicated access and full-fibre broadband on service guarantees. The right answer depends on your site, existing systems, service expectations and the consequences of downtime. Before choosing a supplier, document your current setup and the outcome you want to achieve.
- Scope: define the number of sites, users or devices, what is included and any exclusions.
- Delivery: confirm surveys, access, dependencies, testing, handover and who coordinates the work.
- Support: distinguish installation warranties, response targets, monitoring and ongoing changes.
- Commercial terms: compare the total contract period, renewal terms, ownership and exit arrangements.
What changes the total cost?
Survey, construction, contract length, installation and backup circuits affect lifetime cost. A single advertised price is rarely a complete project quotation. Ask for a breakdown of initial works, recurring charges, optional extras and the cost of future changes.
For a fair comparison, ask each supplier to quote against the same written brief. Make sure proposals explain assumptions rather than treating them as included. A low initial quote can become expensive if it omits essential work or leaves key operational responsibilities undefined.
London-specific project considerations
Availability can differ between adjacent London commercial buildings. For occupied commercial premises, consider access windows, tenant coordination, site surveys, parking and delivery restrictions. Confirm these before accepting an installation date or fixed-price proposal.
How to prepare a useful project brief
Request written service levels, contention details and realistic lead times. Give suppliers the same requirements document, including the site address, required outcomes, existing equipment, site constraints, service hours and any dependencies. Ask them to explain what they will verify during a survey and what could change the final price.
Detailed buyer assessment
Service guarantee
Compare committed bandwidth, repair targets and contractual service levels.
Diversity
Ask whether backup links use physically independent routes and infrastructure.
Contract cost
Include installation, construction excess, hardware, term length and early termination.
Request a like-for-like quotation
Provide a current-system inventory and the London site postcode, floor or unit. Ask every bidder to specify inclusions, exclusions, assumptions and a documented acceptance test. Compare one-off charges, recurring fees, contract length, changes and exit costs.
For a useful comparison, score each proposal against technical fit, disruption, service levels, delivery evidence and total ownership cost. A cheaper proposal is not equivalent if it excludes a requirement you depend on.
Connectivity comparison framework
| Compare | What to verify |
|---|---|
| Performance | Advertised speeds versus committed throughput and latency requirements. |
| Service assurance | Fault response, fix targets and availability commitments. |
| Delivery | Survey, wayleave, excess construction and realistic lead time. |
| Continuity | Separate backup route, failover testing and critical application behaviour. |
Use these criteria to evaluate the same scope across competing quotations. These are comparison criteria, not verified market prices.
Example quotation worksheet
This is a quantity-based worked brief, not a price estimate. Enter supplier rates into a copy of the schedule to compare like-for-like proposals. No rates or project totals have been assumed.
36-month connectivity comparison
| Scope item | Example quantity | Supplier rate to request |
|---|---|---|
| Installation | 1 | one-off setup fee |
| Monthly circuit | 36 | monthly service fee |
| Managed router | 36 | monthly router fee |
| Backup connectivity | 36 | monthly backup fee |
| Migration and cutover | 1 | project fee |
Use the same term and service assumptions for both proposals. Include construction charges only where confirmed. Ask suppliers to separate one-off charges, recurring charges, VAT and exclusions.
Questions to ask before signing
- What is included in the quoted price and what triggers a variation?
- Which prerequisites must our business provide before work can start?
- What tests, documentation and acceptance criteria will be delivered?
- Who supports the service after installation, and how are faults escalated?
- What are the renewal, cancellation and data or equipment handover terms?
Frequently asked question
Is a leased line worth it for a small office?
Request written service levels, contention details and realistic lead times. The practical answer depends on the specification, supplier terms and the conditions at your premises. Ask for the assumptions to be written into your proposal so you can compare alternatives fairly.
Next steps
For a project-specific assessment, explore our Business Leased Lines service, or request a quotation with your London postcode, existing setup and intended timescale. We can help clarify the scope before you commit to a solution.
Get a quote for Business Leased Lines
Share your site, timescale and requirements so the right team can review your enquiry.
Editorial note: this guide provides planning information, not a fixed quotation, legal advice or a guarantee of product features. Costs, availability, licensing and regulations should be verified for the specific project.
